‹ Command Center
OM / DELIVERY CONTROL

Production Readiness

Measured truth, target architecture and an executable path to a fully functional sovereign workspace.

Configure stack →
7.2/10current readiness
Product / UI9/10
Frontend9/10
AI routing6/10
Backend / API8/10
Persistence9/10
Agent execution4/10
Security8/10
Self-hosting6/10
Testing / ops6/10
BLOCKERS

Critical work

4 open

Local model router needs an owned endpointblocked

Agent execution needs an owned sandbox workerblocked

Secrets vault and rotation not connectedcritical

Automated restore and isolation tests incompleteopen

REAL HEALTH PROBE

Service status

probe failed

OM web workspacemeasured

Owner authenticationunverified

OM D1 databaseunavailable

Audit trailunavailable

Ollama / vLLMnot connected

Qdrantnot connected

MinIOsetup required

Edge nodeauthorization required

Measured health endpoint unavailable. External services stay offline until authenticated probes succeed.
IMPLEMENTATION PLAN

10 delivery phases

0/10 tracked complete
Planning baseline: 12–18 weeks for one engineer, or 6–10 weeks for a focused team of 3–4. Validate after Phase 0.
CURRENT + TARGET SYSTEM

Production architecture

zero-trust
Verified now Sovereign target
CURRENT HOSTED LAYER · VERIFIED
Web UI → Owner-authenticated OM API
  ├─ D1 · workspace records
  ├─ Per-owner isolation
  └─ Attributed audit events

SOVEREIGN RUNTIME · TARGET / NOT CONNECTED
Web / Desktop UI
  └─ Authenticated OM Gateway
     ├─ PostgreSQL · users, tasks, audit
     ├─ Redis · queues and leases
     ├─ Qdrant · semantic memory
     ├─ MinIO · files and backups
     ├─ GOD Router
     │  ├─ Ollama / vLLM · local
     │  └─ Cloud models · explicit opt-in
     └─ Sandbox Worker → Owned Edge Node
        └─ Hash-chained audit log
DEFINITION OF DONE

Fully functional means

0/12 verified
Owner-tracked assertions require evidence from real services and tests before production sign-off.